SUBLIMIT · GUIDE

Limitations on subcontracting: how the test is calculated, and how to prove your number.

A set-aside award comes with a promise about how much of the work your own firm will do. This guide explains what the rule measures, the arithmetic behind the percentage, what "similarly situated" changes, and the records you need to show a contracting officer the number is right.

What the rule measures

FAR 52.219-14 (implementing SBA's rule at 13 CFR 125.6) limits how much of a set-aside or sole-source contract a small business may pass to subcontractors. The limits by contract type:

Services
No more than 50% of the amount paid by the government may go to firms that are not similarly situated.
Supplies (non-manufacturer excluded)
No more than 50% of the amount paid, excluding the cost of materials.
General construction
No more than 85%, excluding the cost of materials.
Special trade construction
No more than 75%, excluding the cost of materials.

Two things people miss: the test is measured on amounts paid by the government, not on hours or headcount, and the period of measurement is the contract's period of performance (or each period the contracting officer specifies), not a calendar month. Monthly workforce reports some agencies require are a separate obligation with separate arithmetic.

This guide is a plain-English explanation, not legal advice. The clause in your awarded contract, 13 CFR 125.6 as currently in force, and your contracting officer's direction govern. Mixed contracts (services and supplies) follow the principal-purpose rule and may need counsel.

The arithmetic

Try the free calculator →

  1. Eligible government payments. Total the amounts the government has paid under the contract for the period — invoices paid, not invoiced or accrued.
  2. Counted subcontract amount. Total what you have paid (or are obligated to pay) to subcontractors that are not similarly situated for work under the contract. For supply and construction contracts, exclude the cost of materials.
  3. Percentage. Counted subcontract amount ÷ eligible government payments.
  4. Compare with the limit for the contract type. A fictional services example: $18,420.00 counted subcontracting against $100,000.00 paid = 18.42%, under the 50% limit.

Keep the arithmetic exact. A percentage that is rounded before comparison can sit on the wrong side of a limit.

What "similarly situated" changes

Work subcontracted to a similarly situated entity — a firm that holds the same small-business status the contract was set aside for (e.g. SDVOSB to SDVOSB, 8(a) to 8(a), WOSB to WOSB, HUBZone to HUBZone), and is small for the contract's NAICS code — does not count against the limit. But the similarly situated subcontractor's own lower-tier subcontracts do count. So "similarly situated" is a fact you must verify and document for each subcontractor, not a label you assume from a company name or a website.

The records that prove the number

FactRecordWhy it matters
Contract type and limitThe awarded contract and clause; NAICS codeDetermines which percentage applies and whether materials are excluded
Government paymentsPayment records for the period (not invoices)The denominator
Subcontractor paymentsAP records, subcontract agreements, allocation to this contractThe numerator; allocation matters when a vendor serves several contracts
Similarly situated statusVerification evidence with dateRemoves a subcontractor from the numerator — only if proven
Materials cost (supply/construction)Material invoices separated from laborExcluded from the calculation
Lower-tier subcontractsStatements from similarly situated subsTheir pass-through counts

Contracting officers may ask for a demonstration of compliance at any time; SBA can also review during a size or status protest. The standard is not "we think we're under" but "here is the calculation and every input's source".

Common mistakes

Period-end checklist

Download this checklist as a one-page PDF ↓

Questions people ask

Is the limit checked every month?

The clause measures compliance over the period of performance (or periods the contracting officer sets). Tracking it monthly is how you avoid finding out at the end that you are over — but the monthly figure is a management tool, not the legal test.

What if a subcontractor's status cannot be verified?

Then it is not similarly situated for the calculation, and its payments count. Record the attempt and the gap; do not guess.

Does this replace a workforce report my agency requires?

No. Some agencies require periodic workforce or staffing reports on their own forms. Those are hours- and people-based and separate from the payment-based subcontracting calculation, even though the same records feed both.

A RESULT YOU CAN EXPLAIN

SubLimit does this calculation from your own exports, with every input traced to its row.

Configure the contract once. Each period, import payroll, subcontractor and government-receipt files, verify statuses, and get the exact percentage with a list of everything that is missing or unverified — flagged, never guessed. Prepare the workforce report draft from the same records. Runs on your Windows computer; nothing is uploaded. $149.00/month, 30-day no-card trial.